Climatenza — LDC Mombasa T160 Pre-Feasibility

Developer Logo Client Logo
← Back to Marketplace

Climatenza — LDC Mombasa T160 Pre-Feasibility Assessment v6

Developer Climatenza
Location LDC Mombasa, Shimanzi, Mombasa, Kenya
Methodology AMS-II.C
Est. Emissions Reduction 382 tCO2e/yr
Portfolio Allocation EUR 311,000 ⓘ Portfolio allocation
Period 6 months
Status Open
Start Date 05/03/2026
End Date 05/09/2026
Offer Parameters & Calc Defaults set by the project owner — highlighted values drive the Finance Calculator
Offers in the calculator Project Finance Project + Royalty Credits Hybrid Credit Futures Equity / SAFE / Convertible
in use used when an investor chooses it replaced / dimmed = not used
Funding
Target Raise €311,000
Carbon Project Parameters
Credit Type VREC
Base Carbon Pricefollows the market Live market price
Payback & Insurance
Link Payback to Offer Risk No
🔒
Sign in for the full project view There's a lot more inside.

Public pages show headline data. Once you sign in (or register your own project), this page reveals the full depth of AI-assisted project development that TenzaOne ships.

🧠 AI Assessment

15+ agents VCS readiness scoring · evidence tier · section-by-section gap analysis · methodology fit detection.

🎯 Readiness Coach

AI coach identifies blockers + gap fills + next actions. Tell-me-more on every point with links to Verra docs.

📊 Work Streams

Team-wide parallel-prep board covering 11 topics. Role tags for owner / VVB-liaison / dev / impact / investor-lead.

🤝 Cooperative Fit

Auto-matched peer projects for PoA cooperative candidacy by methodology · scale · country · readiness.

📜 Evidence Chain

Every emission-reduction number traced to its sensor records + calibration certs. Audit-ready.

💼 Owner Controls

Commit snapshots to your Wallet (Ed. 0 Assessment · Ed. 1.x Registry · Ed. 2.x Performance · Ed. 3 Cooperative).

Sign in →Create accountRegister my own project →
Project AI Research Agent
Project Story
Pre-feasibility study for a T160 parabolic trough solar thermal field to preheat the hot-water return header at LDC Mombasa, displacing heavy fuel oil and reducing Scope 1 CO2 emissions.

This pre-feasibility evaluates integrating a Climatenza T160 parabolic trough field (258 collectors, ~1,419 m² aperture) into the existing hot-water network at the LDC Mombasa facility. The recommended configuration uses a pressurised buffer tank, a plate heat exchanger (HX-201) and a return-header preheat tie-in so the existing Thermax boiler provides trim heat while solar heat reduces HFO consumption. (Sources: Executive Summary; Sections 6 and 7 — pages 4, 14, 17.)The base-case screening (DNI = 1,750 kWh/m²·y, PR = 0.85) yields ~4,787 GJ/year useful solar heat (design Q_peak 805 kWth), an indicative solar fraction of ~78.9% of 2025 useful heat, displacement of ~135 t HFO/year and approx. 382 tCO2/year avoided. Key uncertainties and next steps include procuring bankable DNI for the exact coordinates, obtaining hourly hot-water demand, structural/corrosion checks for canopy mounting, water-chemistry and HAZOP/FEED deliverables. (Sources: Solar Field Sizing, Annexure A and Next Steps — pages 12, 23 and 22.)

Verified Impact Data Card
Phase 2 Preview
Verified Impact Data Card

Climatenza — LDC Mombasa T160 Pre-Feasibility

TZ-8033
Methodology: AMS-II.C Vintage: 2026
Baseline 840 tCO2e / year
Net Reduction 382 tCO2e / year
DePIN Integrity
82
DEMO
Data Quality Demo Data
REC 100.0%
Pipeline 75%
Developer: Climatenza Location: LDC Mombasa, Shimanzi, Mombasa, Kenya Methodology: AMS-II.C
✓ Scope 3 Category 15 Compliant ✓ GHG Protocol Aligned CSRD ESRS E1

This project's impact data is structured for Scope 3 Category 15 (Investments) reporting. Verified emissions reductions can be attributed to investor portfolios under the GHG Protocol Corporate Value Chain standard.

CSRD alignment under ESRS E1 (Climate Change) is in preparation and will be available once the EU taxonomy technical screening criteria are finalised for this project category.

Emissions Reduction Breakdown
382.0 tCO2e/yr
● CO₂: ~380.9t ● CH₄: ~0.76t CO₂e ● N₂O: ~0.38t CO₂e
Preview available — full automated export in Phase 2
DePIN monitoring available in Phase 2.
Decentralised physical infrastructure network integration
will provide real-time MRV telemetry for this project.
DePIN Sensor Summary DEMO
YTD Generation
184,200 kWh
Avg Irradiance
512 W/m²
Uptime
99.1%
Nodes Online
7 of 8
VVB Status Pending designation
Assessment Iteration v6
Evidence Tier Tier 1 — Completeness Verified
Commitment Hash —
Committed At —
Blockchain Reference —
Project Intelligence

Ask about this project's carbon methodology, Scope 3 reporting, DePIN integration, or emissions data.

Ask a question about Climatenza — LDC Mombasa T160 Pre-Feasibility...

What is this card?

The Verified Impact Data Card summarises the key environmental and assurance metrics for this project. Data is pulled live from VCS assessments and on-chain commitments.

How to read the data

  • Emissions Reduction — Estimated annual CO2e avoided or removed, derived from the project's VCS methodology and baseline scenario.
  • Overall Score — Composite VCS readiness score (0–100%) covering additionality, permanence, leakage, and MRV quality.
  • REC % — Alignment with Renewable Energy Certificate issuance criteria.
  • EEC % — Alignment with Energy Efficiency Certificate criteria.
  • Phase — Current stage in the project development lifecycle.
  • DePIN Integrity — Data integrity score from decentralised sensor network (uptime, calibration, completeness).

Glossary

  • VCS — Verified Carbon Standard (Verra), a leading carbon credit certification programme.
  • tCO2e/yr — Tonnes of carbon dioxide equivalent per year.
  • VVB — Validation/Verification Body, the independent auditor that reviews project claims.
  • Evidence Tier — Classification of supporting evidence quality (e.g. Tier 1 = measured data, Tier 3 = default factors).
  • Commitment Hash — Cryptographic hash of the assessment data committed to blockchain for tamper-proof audit trail.
  • DePIN — Decentralised Physical Infrastructure Network, providing real-time sensor-based MRV data.
  • Scope 3 Cat. 15 — GHG Protocol category covering financed emissions from investments.
  • CSRD / ESRS E1 — EU Corporate Sustainability Reporting Directive, climate change disclosure standard.
  • MRV — Measurement, Reporting, and Verification.

Share & Embed

Share this project card or embed it on your website.

Full embed functionality available in Phase 2.

Investment Calculator
Loading Calculator...
Credits Simulator
Loading the Credits Simulator...
VCS Readiness Assessment
Summary

The dossier documents a commissioned 48-collector T160 solar-thermal PoC at SSSL Eluru with solid technical descriptions, commissioning date, and a clear monitoring/data-collection design. However, critical VCS prerequisites are missing or unproven (baseline fuel quantities and type, emission-factor use, additionality demonstration, methodology/version specifics, stakeholder consultation and safeguards), so carbon-credit readiness is not yet established.

Scores
Overall Readiness
31%
REC Score
100%
EEC Score
0%
Checklist

Section 1: Project Details 57%

ItemStatusPDDNotes
Physical Location●1.5Evidence is weak or non-specific.
Sectoral Scope(s)●1.4Evidence is weak or non-specific.
Crediting Period Duration✗1.12Evidence is missing.
Crediting Period Type✗1.12Evidence is missing.
Participation in Other GHG Programs✗1.17Evidence is missing.
Host Country●1.5Evidence is weak or non-specific.
GPS Coordinates✗1.5Evidence is missing.
Project Proponent Contact✗1.8Evidence is missing.
Project Client / Offtaker●1.8Evidence is weak or non-specific.

Section 2: Safeguards & Stakeholder Engagement 29%

ItemStatusPDDNotes
Stakeholder Feedback Summary✗2.1Evidence is missing.
Grievance Redress Mechanism✗2.2Evidence is missing.
Respect for Human Rights & Equity✗2.4Evidence is missing.
Worker and Labour Rights✗2.4Evidence is missing.
Free, Prior, Informed Consent (FPIC)✗2.4Evidence is missing.
Cultural Heritage Protection✗2.4Evidence is missing.
Gender Equality Considerations✗2.4Evidence is missing.
Indigenous Peoples Rights✗2.4Evidence is missing.
Biodiversity Impact✗2.4Evidence is missing.
Consultation Dates / Timeline✗2.1Evidence is missing.
Participant Demographics✗2.1Evidence is missing.
Written Grievance Records✗2.2Evidence is missing.
Biodiversity Baseline Assessment✗2.4Evidence is missing.
Stakeholder Feedback Integration Evidence✗2.1Evidence is missing.

Section 3: Methodology Application 31%

ItemStatusPDDNotes
Methodology Version✗3.1Evidence is missing.
Methodology Applicability Check✗3.2Evidence is missing.
Additionality Demonstration Summary✗3.5Evidence is missing.
Regulatory Surplus✗3.5.1Evidence is missing.
Additionality Justification Type✗3.5.2Evidence is missing.
Investment Barriers✗3.5.2Evidence is missing.
Common Practice Analysis✗3.5.2Evidence is missing.
CAPEX✗3.5.2Evidence is missing.
IRR without Carbon Revenue✗3.5.2Evidence is missing.
IRR with Carbon Revenue✗3.5.2Evidence is missing.
LCOH/LCOE✗3.5.2Evidence is missing.
Methodology Conformity Mapping✗3.2Evidence is missing.
Financial Hurdle Rate✗3.5.2Evidence is missing.
Market Conditions Analysis✗3.5.2Evidence is missing.
Regulatory Baseline Check✗3.5.1Evidence is missing.

Section 4: GHG Quantification 5%

ItemStatusPDDNotes
Baseline Emissions (tCO2e/yr)●4.2Evidence is weak or non-specific.
Baseline Emissions Approach✗4.2Evidence is missing.
Project Emissions (tCO2e/yr)✗4.3Evidence is missing.
Project Emissions Approach✗4.3Evidence is missing.
Leakage Emissions (tCO2e/yr)✗4.4Evidence is missing.
Leakage Assessment✗4.4Evidence is missing.
Net GHG Emission Reductions●4.5Evidence is weak or non-specific.
Emission Factors & Data Sources✗4.2Evidence is missing.
Calculation Spreadsheet/Tool✗4.1Evidence is missing.
Uncertainty Assessment✗4.6Evidence is missing.
Ex-Ante Data Parameters✗Table in 4.2/4.3Evidence is missing.
Ex-Post Monitored Parameters✗Table in 5.1Evidence is missing.
GWP Values Source✗4.1Evidence is missing.
Baseline Fuel Consumption✗4.2Evidence is missing.
Project Fuel Consumption✗4.3Evidence is missing.
Energy Production / Savings✗4.2Evidence is missing.
Operating Hours / Capacity Factor✗4.2Evidence is missing.
Grid Emission Factor (Regional)✗4.2Evidence is missing.
Multi-GHG Breakdown (CO2/CH4/N2O)✗4.1Evidence is missing.
Uncertainty Quantification Method✗4.6Evidence is missing.

Section 5: Monitoring Plan 48%

ItemStatusPDDNotes
Equipment Accuracy✗5.1Evidence is missing.
Record-Keeping & Archiving✗5.3Evidence is missing.
Equipment Make / Model✗5.1Evidence is missing.
Equipment Serial Numbers✗5.1Evidence is missing.
Equipment Installation Date✗5.1Evidence is missing.
Calibration Certificate Location✗5.2Evidence is missing.
Data Logger / Historian System✗5.3Evidence is missing.
Data Archival Retention Period✗5.3Evidence is missing.
Named Monitoring Responsible Party✗5.4Evidence is missing.
Non-Compliant Data Procedure✗5.2Evidence is missing.
Methodology
VCS Methodology
AMS-II.C
Version
v15.0
Project Type
Solar thermal (T160 parabolic trough) for industrial process heat (hot-water / boiler return preheat)
Capacity
805 kWth
Baseline Scenario
Baseline: Existing HFO-fired hot-water system at LDC Mombasa served by a Thermax SMW2000 boiler (rated ~2,326 kWth). Baseline uses 2025 measured fuel consumption (monthly HFO log = 179,054 L; mass 170.9 t). Baseline fuel energy input 6,892 GJ/y; boiler thermal efficiency 88% → baseline useful heat 6,065 GJ/y. Baseline CO2 (2025) = 484.5 tCO2/y (derived from HFO ROA emission factor 2.706 kgCO2/L ⇒ 2.835 tCO2/t HFO).
Ghg
Estimated Emissions Reduction 382 tCO2e/year
Renewable Energy Component N/A - Not a renewable energy generation project
Monitoring

Dedicated M&V boundary at the process-side heat exchanger with a heat meter measuring useful heat (Q = ṁ·Cp·ΔT). Continuous field instrumentation (irradiance/weather station, solar-loop TT/PT, process-side TT+FT heat meter, tank strat sensors) is logged to a PLC/SCADA historian and forwarded to a secure gateway/cloud dashboard for performance, availability and carbon accounting. SCADA alarms, soiling indicators and boiler-fuel meter cross-checks form the core verification loop; data are totalised into daily/monthly reports and used for fuel-savings reconciliation and performance guarantees.

Action Plan
  • Provide complete project location details including coordinates, address, and facility name
  • Identify applicable VCS sectoral scope(s) from the official VCS Sectoral Scope list
  • Collect and document information for Project Start Date
  • Collect and document information for Crediting Period Duration
  • Collect and document information for Crediting Period Type
🎯Readiness CoachLive, agent-generated guidance is available for this project — blockers, gap fills, and week-1 actions — in the Progression panel.Open Coach & Progression →
Assessment History
🎯 Readiness Coach · Last Run5 months ago— 1 blocker flagged

Complete stakeholder consultation documentation and FPIC evidence to advance project validation.

v5 Jul 16, 2026 — Admin_full_assessment Assessment
Overall: 0%EEC: 0%REC: 0%

The project demonstrates comprehensive technical documentation, including detailed GHG quantification, monitoring, and risk assessments, indicating strong preparedness for VCS validation. However, cri...

v4 Jul 15, 2026 — Admin_full_assessment Assessment
Overall: 2%EEC: 0%REC: 0%

The project demonstrates comprehensive technical documentation, including detailed GHG quantification, monitoring, and risk assessments, indicating strong preparedness for VCS validation. However, cri...

Operating Company
Project Developer Product & Solution Provider

Climatenza

Climatenza Solar Private Limited
Climatenza builds and operates concentrated solar thermal systems for industrial process heat — replacing fossil boilers in food, chemical, and metals industries. Projects with Coca-Cola, Colgate-Palmolive, JSW Steel, Tata Chemical, PepsiCo.
Business Profile
Jurisdiction
India
Founded
2018
Contact & Social
Linked Projects (2)
Book a Call
🔗 Websites

Inquire about Climatenza — LDC Mombasa T160 Pre-Feasibility

    Commit to Climatenza — LDC Mombasa T160 Pre-Feasibility

    To commit funding to this project, please use the Investment Calculator above to model your investment, then Book a Call or Inquire to discuss next steps with our team.

    Book a Call

    TenzaOne

    Live infrastructure for the carbon project lifecycle.

    Site Tour
    Choose Your Tour
    Tour
    Start at the top, or jump straight to any stop.
    ✕ Exit Tour
    Loading next tour panel…

    Privacy Overview

    TenzaONE

    This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

    Strictly Necessary Cookies

    Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.